Difference between revisions of "Target Metrics"
From Wikoohpedia
Adminstrador (Talk | contribs) m (1 revision imported) |
|
(No difference)
|
Latest revision as of 12:40, 23 December 2015
Target metrics that will be calculated when selecting Calculate Target Criteria in the Frame Selection tab are enabled from Target/Target Metrics section. After calculating them, they will be added as columns as selected metrics. List of possible Metrics: